Detailed explanation of the operation process of the burner of the hot air stenter

2021-01-11 00:00


Before turning on the burner of the hot air stenter setting machine, the staff should not forget to check to ensure that it can be used normally. Then set the temperature according to the process requirements, and then turn on the circulating fan. During the heating phase, when the speed of the main engine reaches 15m/min, the low-temperature combustion engine can reach the predetermined temperature before the cloth operation can be performed. When loading the cloth, it should be noted that the two ends should be as flat as possible. When starting the main engine of the burner of the stenter setting machine, you should ring the bell to notify the operator at the rear of the car, then wear the cloth at a fast speed when the cloth reaches the rear of the car, and tighten the fabric. The staff behind should cooperate ready. Keep in mind that the position of the cloth in and out of the machine should ensure that its safety shield is in good condition to avoid accidents. During the operation, if any problems are found, the equipment should be shut down in time without negligence. In addition, the grey fabric must be sewn and knotted, so as not to damage the rubber roller and cause safety accidents. After the operation is over, the burner equipment of the stenter setting machine should be shut down as required, and the cooling requirements should be notified to the hot-load heat-conducting oil furnace before the shutdown. First stop the circulating fan and open the door to cool down, and stop the machine when its temperature drops to 80°C. In the daily operation process, the staff need to maintain good working habits, especially to check the heat transfer oil pipeline in the oven regularly, and deal with the oil leakage in time. In addition, the burners of the stenter setting machine should be cleaned and taken care of and kept in normal working conditions. It should be noted that whether it is cleaning or adding lubricating oil, it should be done after the equipment stops running. When the burner of the stenter setting machine is in operation, operations such as chain wiping, needle brushing, and roller wiping are not allowed to avoid accidents. If you are interested in low temperature burners, please contact us for a quote!

  • BNG15/P gas burner

  • BNG85/120P/FC Gas Burner

  • BNG28P gas burners

  • BNL120/180/250 P/FC Light Oil Burner

  • BNH10G Heavy Oil Burner

  • BNG150/210P/FC Gas Burner

  • BNL300/350/600 P/FC diesel oil Burner

  • BNG50/60P Gas Burner

Inquiry For all inquiries, please fill in the form below (* are required) to send us a brief message, and we will get back to you as soon as possible.
Name:
Whatsapp:
* E-mail:
Product:
* Message:
Click on the button to verify