Home > News >

Emergency plan for coal-fired heat-conducting oil boiler diesel burner

2021-01-08


Corresponding emergency procedures after the accident of the thermal oil boiler diesel burner 1. The thermal oil boiler diesel burner, in the community stage The factory rescue plan was previously initiated, including detection and control of the source of leakage, early fire extinguishing and rescue, monitoring and covering of surrounding fire and explosion damage units, namely plants, water tank farms with fire-fighting water spray, loading and unloading machines to stop loading and unloading, to prevent the spread of the fire and the second split. 2. The factory should promptly report to the duty room of the company's emergency rescue headquarters and accept the command of the emergency rescue headquarters. (119 is fire and explosion, 120 is employee first aid, 110 is order maintenance). 3. After receiving a complaint from the duty room of the emergency rescue headquarters, promptly notify the chief commander of the emergency rescue headquarters and all members to arrive at the chaotic scene. Members and the headquarters perform this part of their duties under the unified command of the commander-in-chief. In case of emergency, please arrange for work stoppage and return, and then report to the headquarters. 4. For the riot part, judge whether the riot can be effectively controlled according to the severity of the riot, and report to the commander-in-chief whether the instructions should be sent to the emergency rescue headquarters for help. 5. According to the type, severity and quantity of the spillage at the scene, initially determine the scope of the warning area in the riot part, and report the scale to the headquarters. Workers in the injured area were evacuated to a safe area. 6. After the safety warning team arrives at the scene, it should clearly distinguish the restricted area according to the command and order, be responsible for the safety and traffic command inside and outside the restricted area, conduct group chats, and set up positions on the scene. Increase vigilance and patrol. The factory will cooperate with rescue, search and transfer to the area. Before the future of medical personnel, the factory should actively carry out rescue. 7. The safety evacuation team assists the interference department to detect the concentration of the leaked material according to the wind direction, and report the interference to the headquarters at any time to affect the changes in the area, and recommend whether to allow staff to participate in the area. If there is no detection method, sampling should be arranged to be sent to the monitoring station and laboratory for analysis. 8. After determining the evacuation area, the headquarters shall promptly notify the staff involved in the evacuation. After receiving the evacuation order, the safety evacuation team should instruct the staff in the area to evacuate the injured area quickly and orderly through banners, signals and broadcasting associations, and occupy the conference at the designated location. 9. The rescue step team of the Engineering Department quickly carried out equipment measures to repair, control the chaotic operation and check before the start of the operation 1. Whether the heating furnace and its surrounding environment are clean and free of debris, check the furnace body, burners, controllers, fire holes and smoke (chimneys) ) Whether the channel is normal; 2. Countercurrent process equipment and process, check whether the oil level of the expansion tank is higher than 1/4 to 1/2 level, and whether the thermometer and pressure gauge are normal; 3. Connect the heating furnace control cabinet power supply and check whether the voltage Normal, check whether the indicator light and all the display instruments are normal; 4. Adjust the main pressure reducing valve and the secondary pressure reducing valve to control the pressure at 0.005mpa. Start 1. Start the heat transfer oil circulating pump (standby, according to the pump operation rules), and keep the pressure stable for about 0.5 hours after starting the pump; 2. Press the burner start button and observe whether the flame in the furnace is burning normally. If it does not ignite, please start the burner again after troubleshooting. Furnace operation 1, normal stop (1) Gradually reduce the temperature, turn off the burner, and stop burning; (2) When the hot oil temperature drops below 70°C, stop the operation of the hot oil circulating pump (see the operation rules of the water pump); ( 3) Turn off the main power and make a record of switching. 2. Emergency stop. If the furnace is shut down due to an emergency, the burner should be shut down quickly, and the burner should be moved along the burner reaming axis to form a natural ventilation state between the furnace and the chimney, accumulate heat and distribute it in the furnace, so that The heat transfer oil cools naturally to prevent overheating. Matters needing attention During the inspection, you should pay attention to check whether there is leakage around the light oil burner of the heat transfer oil furnace. There should be sufficient petroleum and electrical fire fighting equipment nearby. Water should not be used as an extinguishing agent. Troubleshooting 1. The outlet oil temperature exceeds the temperature. When the outlet oil temperature exceeds the set upper limit of 20°C or 350°C, the computer will flash over temperature, forcing the controlled device to shut down. 2. The flue temperature exceeds the temperature. When the flue gas temperature exceeds the set limit temperature of 300°C, the flue temperature overtemperature indicator is used to shut down the controlled equipment. 3. Low pressure difference When the inlet and outlet oil pressure of the boiler diesel combustion engine is lower than the set pressure difference value, the computer will indicate a fault and the controlled equipment will be forced to shut down. 4. Overpressure When the oil pressure of the boiler diesel combustion engine is higher than the set high pressure point, the computer malfunctions and the controlled equipment is forcibly shut down. 5. Power prompt When the system network voltage exceeds the normal working range (180V-260V), it will prompt a screen failure and the equipment will not interlock ! If you are interested in diesel combustion engines, please contact us for a quote!

  • Blue charcoal boiler burner made in China boiler burner

  • Biomass burner particulate fuel selection requirements

  • Sources and prevention of combustible gases in biomass burners

  • Biomass burner Biomass burner technology is an advanced technology for manufacturing energy-saving an

  • What material does the biomass burner burn?

  • Technical advantages of biomass burners

  • Pay attention to environmental protection in the use of biomass burners

  • How to maintain and repair the burner for a short period of time

Inquiry For all inquiries, please fill in the form below (* are required) to send us a brief message, and we will get back to you as soon as possible.
Name:
Whatsapp:
* E-mail:
Product:
* Message: